The project is addressed at the renovation of the park and city center. The main east entrance create a visual connection between city centre, the park and the Danube River. Some of the unnecessary alley with secondary and tertiary importance, which is preserved size and shape, were removed. Thereby increasing the amount of green areas. Pavements is mainly replaced and construction of new ones are in line with those already in existence . Designed a new circuitous alley which logically bind all the elements in the park and at the same time is suitable for biking and walking.
DESIGN GROUP STUDIO ltd. www.dgstudio.eu office[at]dgstudio.eu +359 885 631 694 +359 885 376 837 ISO Certificate